Run the App and Core test modules side by side in the gate #51
Labels
No labels
Compat/Breaking
Kind/Bug
Kind/Documentation
Kind/Enhancement
Kind/Feature
Kind/Security
Kind/Testing
Priority
Critical
Priority
High
Priority
Low
Priority
Medium
Reviewed
Confirmed
Reviewed
Duplicate
Reviewed
Invalid
Reviewed
Won't Fix
Status
Abandoned
Status
Blocked
Status
Need More Info
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
ethan-hann/SavePoint#51
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
From the test-suite review (deferred item S3,
.tools/reviews/test-suite/code-review-test-suite.md).The gate runs one test module at a time (
--max-parallel-test-modules 1inbuild/gate.ps1andbuild/gate.sh). That rule came from a machine-load problem that is now gone: the process leak was fixed on 2026-10-21, and recent gates end with about 64 GB free of 95 GB on a 16-core, 32-thread machine.The cost is large. The App module runs one test at a time for 315 of its 336 s (its UI tests share one headless UI thread), while Core uses four threads. Running both modules together means about five busy threads and should take the Windows gate from about 9.5 minutes to about 6. The estimate comes from the xunit reports; it is not measured.
The risk is flaky timing-sensitive tests, not memory or CPU:
ComposedApp.Render;Both modules also share one temp root (
.tools/tmp/<os>,tests/Shared/TestEnvironment.cs). Each test makes its own folder, so a collision is unlikely, but check that no fixture uses a fixed name.Plan:
--max-parallel-test-modules 2in both gate scripts. Keep below-normal priority and 4 Core test threads.AGENTS.mdanddocs/developer-guide.md, and record the decision indocs/decisions.md.Linux CI runs on the Unraid runner and can take the same change.
Done when three consecutive Windows gates pass with both modules in parallel, with the measured times in this issue, and the docs say the new rule.