StartupLeftoverGitTests can fail under WSL on a 9p mount #172

Closed
opened 2026-10-26 04:05:48 -05:00 by ethan-hann · 1 comment
Owner

Two StartupLeftoverGitTests (A_git_the_note_of_a_stopped_SavePoint_names_is_ended..., The_screen_is_told_a_task_started...) failed once each in WSL runs of the Linux gate with "the leftover git is still running" and passed on rerun. Likely kill or zombie-reaping timing on the 9p mount. Check whether the leftover check treats a zombie (state Z in /proc) as gone, as D47.8 does for the stamp check, and make the test wait on reaping rather than on a fixed time.

Two StartupLeftoverGitTests (A_git_the_note_of_a_stopped_SavePoint_names_is_ended..., The_screen_is_told_a_task_started...) failed once each in WSL runs of the Linux gate with "the leftover git is still running" and passed on rerun. Likely kill or zombie-reaping timing on the 9p mount. Check whether the leftover check treats a zombie (state Z in /proc) as gone, as D47.8 does for the stamp check, and make the test wait on reaping rather than on a fixed time.
ethan-hann added this to the Later milestone 2026-10-26 04:05:48 -05:00
Author
Owner

Not needed any more: the local Linux gate no longer runs under WSL on a 9p mount (D60, #195); it runs on the Linux VM on ext4, where these tests pass (full VM gate runs on integration-0917). The leftover-git waits were also tied to the leftovers wait in #186.

Not needed any more: the local Linux gate no longer runs under WSL on a 9p mount (D60, #195); it runs on the Linux VM on ext4, where these tests pass (full VM gate runs on integration-0917). The leftover-git waits were also tied to the leftovers wait in #186.
Sign in to join this conversation.
No milestone
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".